|
QUOTE REQUIRMENTS
Quote Requirement Checklist was prepared to facilitate your request
for quote. It is split up by service options. For each service we will be
performing, there is a checklist of documentation that is required to expedite
your request. Please provide all pertinent documents and information by email.
Use this checklist to make sure Eagle gets the proper documentation
A. Board
Layout
[ ] Schematic
[ ] Net List
[ ] Physical parameters
B. Board
Fabrication
[ ]Gerber files
[ ] Board REV level
[ ] Fabrication Drawing (AutoCad or
PDF format Preferred)
C.
Electronic PCB Assembly [ ] Complete BOM (Excel format)
NOTE: This should include
- ref.
designator
- MFG.
part #
- part
description, including package size
- value
- part
marking
[ ] Gerber files
[ ] Assembly Drawing (PDF format Preferred) this must show
reference designators
[ ] Assembly instructions (incl. all special placements / orientations /
component handling along
with any hand
or rework instructions.)
[ ] Sample board / cable (if available)
[ ] Bare Board (if available)
[ ] Special Handling Instruction
[ ] Rework Instructions
D.
Components Purchasing
(Procurement)
[ ] Complete BOM (as above)
[ ] AVL (approved vendor list)
[ ] Cross Approvals |